31
Engineering & Assets

Calibration, Qualification & Predictive Maintenance

Every GxP-critical asset carries a qualification state (IQ/OQ/PQ), a calibration due date and a live health score — production cannot dispense or release against an unqualified or overdue instrument.

GxP assets
10
registered & qualified
Calibration overdue
1
blocks batch release
Due within 14 days
4
Qualification gaps
2
IQ/OQ/PQ pending
Mean asset health
75%
AI condition index

Asset & instrument register

AssetLocation / lineCriticalityQualificationCalibration dueHealthStatus
EQ-1041
Fette 3090i Rotary Tablet Press
Line 3 — TabletsHighApproved2026-09-04(17d)
Running
EQ-1102
Glatt GPCG 300 Fluid Bed Dryer
Line 3 — TabletsHighApproved2026-08-24(6d)
Running
EQ-1188
IMA Comprima Capsule Filler
Line 2 — CapsulesHighPending2026-08-21(3d)
Idle
EQ-1240
Bosch Ampoule Filling Line
Line 5 — SterileHighApproved2026-10-12(55d)
Running
EQ-1305
Autoclave 1200 L
Sterile UtilitiesHighOverdue2026-08-12(-6d)
Under Maintenance
EQ-1422
Purified Water Loop PW-01
UtilitiesHighApproved2026-09-30(43d)
Running
EQ-1510
HVAC AHU-07 (Grade C)
UtilitiesMediumApproved2026-08-27(9d)
Running
EQ-1633
HPLC Agilent 1260 #3
QC LaboratoryMediumApproved2026-08-20(2d)
Running
EQ-1701
Blister Machine Uhlmann B1240
Packaging Hall AMediumApproved2026-11-02(76d)
Running
EQ-1808
Cold Room CR-02 (2–8 °C)
WarehouseHighApproved2026-09-15(28d)
Running

AI predictive maintenance alerts

  • EQ-1041 · Tablet Press

    Signal — Compression force variance +18% over 5 batches; upper punch wear pattern detected

    Impact — Predicted weight-variation deviation within 9 production days · 3 batches at risk

    Recommendation — Schedule punch set replacement in the 22 Aug changeover window

  • EQ-1305 · Autoclave 1200 L

    Signal — Sterilisation cycle F0 drift and calibration overdue by 6 days

    Impact — Sterile batch release blocked — GxP qualification state is Overdue

    Recommendation — Escalate to QA, quarantine affected loads and re-qualify (OQ/PQ) before next cycle

  • EQ-1510 · AHU-07

    Signal — Differential pressure trending toward Grade C lower limit during night shift

    Impact — Environmental monitoring excursion risk in packaging corridor

    Recommendation — Replace HEPA pre-filters and re-balance airflow this weekend

Records & transactions

Asset / equipment · Maintenance work order · Calibration record

No records posted in this module yet. Use “New record” to create one — it is saved to the shared database with an audit entry, recomputed into the KPIs and alarms, and fed to the AI agents as live context.